A road extension can leave you short of the money you need to finish the junction. In Trafficity, design the route and its connections together before adding extra pavement. If the plan exceeds your construction balance, shorten the essential connection or remove road the network can spare.
Budget for the working route
Start with the shortest connection that will carry the traffic you are trying to move. Leave room in the budget for the intersection that makes the connection useful. In one narrated preview playthrough, a player ran out of money while trying to add signals after road work. Treat that as an example of why to reserve funds, without using the playthrough's balance as a release price.
Shorten the connection when money runs low
Review the proposed route before spending on a longer alignment. If the road only needs to reach one side of a block, connect it there and leave the extension for later. When trimming an existing segment, keep any route that still serves a building or provides an important exit. In the same preview playthrough, shortening spare road returned some construction budget and let the player continue the project.
Check the refund on your build
Update 2 fixed cases where refunds and construction costs did not match. Use the current build and check the balance change on a small, expendable stretch before counting on money from a larger rebuild. The Trafficity Update 2 patch notes document the refund fix.
FAQ
Does deleting a road refund its full construction cost?
Some road changes can return money. The available evidence does not establish an exact refund for every road or junction.
What should I cut first if I cannot afford a junction?
Shorten a proposed extension or trim unused pavement before cutting a working connection. Keep enough budget to complete the junction that the route needs.
Can I price a new project from a preview playthrough?
Use preview footage to understand the decisions. Check the current game balance for the actual cost and refund.