A bridge lets a busy through movement cross a junction at a different height. It works best when you decide which trips should go over the crossing and which still need the street below. Pick the bridge's two ground connections before you start climbing.

Start the bridge from a surface approach

Begin the crossing on the ground and leave room to raise the road before it reaches the junction. Trafficity supports overpasses through its road tools, as described on the official Trafficity store page.

Cross at elevation and return to level zero

Raise the bridge segment before the crossing, carry it over the junction, then return to level zero and tie it into the road on the far side. In ExactChaos's preview, the player used this sequence to carry one movement over an existing road junction. That example shows the layout without relying on a particular key or clearance measurement.

Check where both routes carry traffic

Follow the intended through movement from the surface approach onto the span and out the other side. Keep a usable local connection for turns that still belong at ground level. If traffic backs up at the bridge exit, give the receiving road room before adding more links to the span.

Frequently asked questions

Which movement should use the bridge?

Choose a through movement that repeatedly conflicts with traffic at the lower junction. Leave short local trips at ground level when their destinations are nearby.

Does the bridge need a connection on both sides?

Yes. Plan the far-side approach so that the elevated road returns to ground level and joins a usable road.

Why are cars still queuing after I build an overpass?

Check whether drivers are using it and whether the exit has space for arriving traffic. A queue at the bridge landing can hold up the new route.